Fields of Specialty
Contractors requiring Bonds and Guarantees are initially required to register with CGF, free of charge. The criteria and procedures for registration and the obtaining of Bonds and Guarantees are provided below.
|
planning, leading, executing, supervising and inspecting
for Registration download Applications
Fields of Specialty
You can mail your completed, signed, and notarized Application for Contractor Registration Mail to: Construction Guarantee Fund No. 123, Level 1, Wijerama Mawatha, Colombo 07 Sri Lanka. |
|
Note: All signatures on your application must be original and notarized. We cannot accept a copy of your application. |
|
Completed applications submitted by mail are currently taking 1-2 weeks after process and activate your registration. Once your organization is registered, it will be listed in our registered contractor list and eligible to get all CGF services with conditions. | |
If any of the required information is missing or incorrect, we will contact you to help complete your registration. | |
|
The national registration and grading of construction contractors as specified by CIDA with the respective capacities and maximum limits are given below;
Specialty | National Grade | Maximum Financial Limit (Rs. Million) at any given time | |
---|---|---|---|
Building Construction Highway Construction Bridge Construction Water Supply and Sewerage Irrigation and Drainage Canals Dredging and Reclamation Storm Water disposal and Land Drainage Maritime Construction Heavy Construction (Areas to be Specified) |
CS2 | X > 3000 | |
CS1 | 3000 ≥ X > 1500 | ||
C1 | 1500 ≥ X > 600 | ||
C2 | 600 ≥ X > 300 | ||
C3 | 300 ≥ X > 150 | ||
C4 | 150 ≥ X > 50 | ||
C5 | 50 ≥ X > 25 | ||
C6 | 25 ≥ X > 10 | ||
C7 | 10 ≥ X > 05 | ||
C8 | 05 ≥ X > 02 | ||
C9 | 02 ≥ X | ||
Specialist Contractor: Electrical & Mechanical Services (EM) Sub Specialty |
|||
Mechanical Ventilation and Air Conditioning (MVAC) Refrigeration (RF) Electrical Installations (Low Voltage) (EI-LV) Plumbing & Drainage (PD) Elevators, Escalators & Travellators (EET) Generators (Gen) Electrical Installation (Medium Voltage) (EI-MV) Extra Low Voltage Installations (Data, Telecommunication and Security Systems, Public address systems, Pipe music systems (ELV) Fire Detection, Protection & Suppression (FDPS) Medical Gas Systems (MG) LP Gas Systems (LPG) Heavy Steel Fabrications (HSF) |
|||
EM 1 | X ≥ 50 | ||
EM 2 | 50 ≥ X > 25 | ||
EM 3 | 25 ≥ X > 10 | ||
EM 4 | 10 ≥ X > 02 | ||
EM 5 | 02 ≥ X | ||
Specialized Construction Contractors (SP-C) | |||
Aluminum & Finishes (A&F) Floor, Wall & Ceiling Finishes (FW&C) [must specify the finish] Carpentry & Joinery (Carp) Light Metal Work (ME) Landscaping (LA) Furniture, Fittings & Equipment (FF&E) Water Proofing (WP) Swimming Pools (SP) Industrial Domestic Soil Nailing & Stabilization (SN) |
SP1 | X ≥ 50 | |
SP2 | 50 ≥ X > 25 | ||
SP3 | 25 ≥ X > 10 | ||
SP4 | 10 ≥ X > 02 | ||
SP5 | 02 ≥ X | ||
Piling | |||
Geotechnical Piling - Pre Cast (GP-P) Geotechnical Piling - Bored Cast I (GP-B) |
GP-P | X ≥ 50 | |
GP-B1 | X ≥ 150 | ||
GP-B2 | 150 ≥ X > 50 | ||
GP-B3 | 50 ≥ X > 10 | ||
GP-B4 | 10 ≥ X | ||
With above two qualifications Business Registration (BR) and CIDA Registration the Contractors can bid for projects within their capacity and at the same time could register with CGF for facilities within CIDA capacity contracts. |
Extra professional input in Construction Management